Development of Waste Management Plans

Devel­op­ment of Waste Man­age­ment Plans for Enter­pris­es, Insti­tu­tions and Orga­ni­za­tions

A Waste Man­age­ment Plan for an enter­prise, insti­tu­tion or orga­ni­za­tion is a doc­u­ment that defines the cur­rent state and planned mea­sures for man­ag­ing waste gen­er­at­ed or treat­ed in the course of the enti­ty’s activ­i­ties.

The Plan con­tains infor­ma­tion on the types and quan­ti­ties of waste, places of its gen­er­a­tion and stor­age, meth­ods of col­lec­tion, trans­porta­tion and treat­ment, as well as fore­cast indi­ca­tors and mea­sures aimed at pre­vent­ing waste gen­er­a­tion and reduc­ing waste vol­umes.

Waste Man­age­ment Plans are devel­oped in accor­dance with the Law of Ukraine “On Waste Man­age­ment” and the Pro­ce­dure for the Devel­op­ment of Waste Man­age­ment Plans by Enter­pris­es, Insti­tu­tions and Orga­ni­za­tions, approved by Order No. 1003 of the Min­istry of Envi­ron­men­tal Pro­tec­tion and Nat­ur­al Resources of Ukraine dat­ed 9 August 2024.

Who is required to develop a Waste Management Plan?

In accor­dance with Ukrain­ian leg­is­la­tion, Waste Man­age­ment Plans are devel­oped by:

  • waste gen­er­a­tors required to sub­mit a waste dec­la­ra­tion;
  • busi­ness enti­ties oper­at­ing in the field of waste man­age­ment.

A waste dec­la­ra­tion must be sub­mit­ted by waste hold­ers whose activ­i­ties result in the gen­er­a­tion of haz­ardous waste, as well as by hold­ers of non-haz­ardous waste if the annu­al vol­ume of such waste exceeds 50 tonnes.

There­fore, the require­ment to devel­op a Waste Man­age­ment Plan applies to a wide range of indus­tri­al, man­u­fac­tur­ing, min­ing, con­struc­tion, munic­i­pal and oth­er enter­pris­es whose activ­i­ties meet the cri­te­ria estab­lished by law.

For what period is a Waste Management Plan developed?

A Waste Man­age­ment Plan is devel­oped for a peri­od of five years and approved by an admin­is­tra­tive doc­u­ment issued by the enter­prise, insti­tu­tion or orga­ni­za­tion.

If an enter­prise has branch­es or sep­a­rate sub­di­vi­sions with­out legal enti­ty sta­tus locat­ed with­in the same ter­ri­to­r­i­al com­mu­ni­ty, a sin­gle Waste Man­age­ment Plan may be devel­oped for them.

If such facil­i­ties are locat­ed in dif­fer­ent ter­ri­to­r­i­al com­mu­ni­ties, the num­ber of Waste Man­age­ment Plans must cor­re­spond to the num­ber of ter­ri­to­r­i­al com­mu­ni­ties in which they are locat­ed.

What does a Waste Management Plan include?

A Waste Man­age­ment Plan is pre­pared tak­ing into account the spe­cif­ic activ­i­ties of the enter­prise and includes the key infor­ma­tion required to assess the cur­rent sit­u­a­tion and plan the future waste man­age­ment sys­tem.

The Plan includes:
  • an intro­duc­to­ry sec­tion and the legal basis for prepar­ing the doc­u­ment;
  • a descrip­tion of the enter­prise, its activ­i­ties and pro­duc­tion capac­i­ties;
  • an analy­sis of the cur­rent state of waste man­age­ment;
  • infor­ma­tion on waste types, codes and quan­ti­ties;
  • infor­ma­tion on waste gen­er­a­tion sources and loca­tions;
  • a descrip­tion of the waste col­lec­tion and tem­po­rary stor­age sys­tem;
  • infor­ma­tion on waste trans­porta­tion and fur­ther treat­ment;
  • fore­cast indi­ca­tors for waste gen­er­a­tion;
  • mea­sures aimed at pre­vent­ing and reduc­ing waste gen­er­a­tion;
  • mea­sures aimed at improv­ing the waste man­age­ment sys­tem;
  • tar­get indi­ca­tors and pro­ce­dures for mon­i­tor­ing the imple­men­ta­tion of the Plan.

Waste is clas­si­fied in accor­dance with the Nation­al Waste List, with the appro­pri­ate code assigned to each type of waste.

Analysis of the Current State of Waste Management

One of the key stages in devel­op­ing a Waste Man­age­ment Plan is the analy­sis of the actu­al waste man­age­ment sys­tem in place at the enter­prise.

Dur­ing this stage, the fol­low­ing aspects are iden­ti­fied and analysed:
  • tech­no­log­i­cal process­es and sources of waste gen­er­a­tion;
  • types and codes of waste;
  • actu­al quan­ti­ties of waste gen­er­at­ed in pre­vi­ous years;
  • loca­tions where waste is gen­er­at­ed and tem­porar­i­ly stored;
  • exist­ing waste col­lec­tion meth­ods;
  • meth­ods and routes used for trans­fer­ring waste;
  • busi­ness enti­ties to which waste is trans­ferred for fur­ther treat­ment;
  • avail­able envi­ron­men­tal, pro­duc­tion and account­ing doc­u­men­ta­tion of the enter­prise.

Waste Management Planning

Based on an analy­sis of the enter­prise’s actu­al per­for­mance indi­ca­tors and tech­no­log­i­cal process­es, the waste man­age­ment sys­tem is planned for the next five-year peri­od.

The plan­ning process includes deter­min­ing:
  • fore­cast quan­ti­ties of waste gen­er­a­tion for the next five years;
  • spe­cif­ic and lim­it indi­ca­tors of waste gen­er­a­tion;
  • mea­sures to pre­vent waste gen­er­a­tion;
  • mea­sures to reduce the quan­ti­ties of waste gen­er­at­ed;
  • mea­sures to ensure prop­er waste col­lec­tion, stor­age, trans­porta­tion and treat­ment;
  • areas for improve­ment of the exist­ing waste man­age­ment sys­tem;
  • tar­get indi­ca­tors for the imple­men­ta­tion of the Plan;
  • sources of financ­ing for the planned mea­sures.

When should a Waste Management Plan be amended?

The Waste Man­age­ment Plan must reflect the actu­al activ­i­ties of the enter­prise. In the event of sig­nif­i­cant changes to pro­duc­tion process­es or the waste man­age­ment sys­tem, the doc­u­ment must be updat­ed accord­ing­ly.

Amend­ments to the Plan are required, in par­tic­u­lar, in the event of:
  • the gen­er­a­tion of new types of waste;
  • a change in waste gen­er­a­tion vol­umes of more than 20%;
  • changes to tech­no­log­i­cal process­es;
  • oth­er changes in busi­ness activ­i­ties that affect the enter­prise’s waste man­age­ment sys­tem.

The rel­e­vant amend­ments must be intro­duced and approved with­in three months from the date on which the grounds for such amend­ments arise.

Who develops Waste Management Plans?

The devel­op­ment of a Waste Man­age­ment Plan requires an analy­sis of the enter­prise’s tech­no­log­i­cal process­es, iden­ti­fi­ca­tion and clas­si­fi­ca­tion of waste, review of pro­duc­tion and envi­ron­men­tal doc­u­men­ta­tion, fore­cast­ing of waste gen­er­a­tion vol­umes, and devel­op­ment of a com­pre­hen­sive set of waste man­age­ment mea­sures.

Insti­tute of Geol­o­gy pro­vides com­pre­hen­sive devel­op­ment of Waste Man­age­ment Plans for enter­pris­es, insti­tu­tions and orga­ni­za­tions in accor­dance with the require­ments of cur­rent Ukrain­ian leg­is­la­tion.

As part of our ser­vices, our spe­cial­ists:
  • analyse the enter­prise’s activ­i­ties and tech­no­log­i­cal process­es;
  • review avail­able envi­ron­men­tal, pro­duc­tion, account­ing and report­ing doc­u­men­ta­tion;
  • iden­ti­fy sources of waste gen­er­a­tion;
  • clas­si­fy waste in accor­dance with the Nation­al Waste List;
  • analyse actu­al waste gen­er­a­tion vol­umes;
  • deter­mine spe­cif­ic and lim­it waste gen­er­a­tion indi­ca­tors;
  • cal­cu­late fore­cast waste gen­er­a­tion vol­umes for a five-year peri­od;
  • analyse the exist­ing sys­tem for waste col­lec­tion, stor­age, trans­porta­tion and treat­ment;
  • devel­op mea­sures to improve the waste man­age­ment sys­tem;
  • define tar­get indi­ca­tors and a mon­i­tor­ing sys­tem;
  • pre­pare the final Waste Man­age­ment Plan with all required tables and appen­dices.

The result of our work is a com­plete Waste Man­age­ment Plan for an enter­prise, insti­tu­tion or orga­ni­za­tion, devel­oped with due con­sid­er­a­tion of the clien­t’s spe­cif­ic activ­i­ties and the require­ments of cur­rent Ukrain­ian leg­is­la­tion.

Order a Waste Management Plan

The spe­cial­ists of the Insti­tute of Geol­o­gy will help deter­mine whether your enter­prise is required to devel­op a Waste Man­age­ment Plan, analyse the avail­able doc­u­men­ta­tion and pre­pare the doc­u­ment in accor­dance with the require­ments of cur­rent leg­is­la­tion.

Con­tact us for a con­sul­ta­tion and a cost esti­mate:

Con­tact us for a con­sul­ta­tion and pre­lim­i­nary cost esti­mate:

Con­tact the Insti­tute of Geol­o­gy — we will pre­pare a Waste Man­age­ment Plan for your enter­prise, from the analy­sis of ini­tial data to the com­plet­ed doc­u­ment.

“ ‘